4 start test sequence, Start test sequence – Colorlight CL20 User Manual

Page 42

Advertising
background image

MAIN MENU

Page 42

User’s Manual

11.8.6.4

Start test sequence

This menu starts a test sequence which tests the movement of the lamp housings and focus for
each lamp house one at a time.

The test sequence will perform as follows:

At test sequence startup the lamp housing will be moved to parking position.
The horizontal axis will be rotated one full revolution clockwise.
The vertical axis will be rotated one full revolution clockwise.
The left lamp houses focus motor is activated during 10seconds.
The right lamp houses focus motor is activated during 10secinds.

The whole sequence above will be repeated 5 times before the test sequence is automatically
abandoned. Every even time the rotation will be anti clockwise and every odd time the rotation
will be clockwise. During the test sequence the operator can switch on and off lights by simply
press the button (2) and (5) according to the figure in

3. OPERATOR PANEL, OVERVIEW

. The

test sequence can’t be abandoned by the operator without switching off the main power in the
electrical box.

Advertising
This manual is related to the following products: