Testing data persistent recovery, Figure 45, Console window – Dell POWEREDGE R710 User Manual

Page 61: Figure 46, Job controller

Advertising
background image

Dell HPC Tiered Storage Solution

Page 59

Testing data persistent recovery

To test data persistent recovery:

1. Open a Terminal or Console window.

2. Perform an action that executes an open and read on an archived file to initiate the recovery

operation. For example, you can use the vi or cat commands to do this:

vi <path><filename>

cat <path><filename>

Console Window

Figure 45.

You can track the progress of the job from the Job Controller or Event Viewer window of the
CommCell console.

Multiple stub recoveries (group or directories of files) are submitted to the Job Controller as one job
called a Persistent Recovery job.

Job Controller

Figure 46.

After recovery, stubs are replaced by files in the location specified.

Advertising