Step 2 install the header bracket, Installation step 2, Install the header bracket – Chamberlain 1215EM FS2 User Manual

Page 18

Advertising
background image

18

INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall

above the garage door, or to the ceiling. Follow the

instructions which will work best for your particular

requirements. Do not install the header bracket over
drywall. If installing into masonry, use concrete
anchors (not provided).

WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with the

bottom edge of the bracket on the horizontal line as

shown (with the arrow pointing toward the ceiling).

• Mark the vertical set of bracket holes (do not use the

holes designated for ceiling mount). Drill 5 mm pilot

holes and fasten the bracket securely to a structural

support with the hardware provided.

HARDWARE SHOWN ACTUAL SIZE

Lag Screws
5/16"-9x1-5/8"

Highest Point of
Garage Door Travel

Vertical
Centerline of
Garage Door

Wall Mounting Holes

Optional

Wall Mounting Holes

Door Spring

Header

Bracket

Header
Wall

38 mm
Board

Vertical Centerline
of Garage Door

Garage
Door

– –

Ceiling Mounting Holes

Lag Screws
5/16"-9x1-5/8"

Garage Door

Vertical Centerline

of Garage Door

Header Wall

– Finished Ceiling –

Header

Bracket

15 cm Maximum

Vertical
Centerline of
Garage Door

Door
Spring

CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as shown.
• Center the bracket on the vertical mark, no more than

15 cm from the wall. Make sure the arrow is pointing

toward the wall. The bracket can be mounted flush

against the ceiling when clearance is minimal.

• Mark the side holes. Drill 5 mm pilot holes and fasten

bracket securely to a structural support with the

hardware provided.

Lag Screw
5/16"-9x1-5/8"

Advertising