10 j, 10 f – Samson DOUBLE BRAID Class II Eye Splice Modified for TS-II Turbo User Manual

Page 7

Advertising
background image

PAGE 7 OF 8

SamsonRope.com

| Email

[email protected]

| Tel

+1.360.384.4669

Double Braid Class II Eye Splice Modified for TS-II Turbo

S A M S O N S P L I C I N G I N S T R U C T I O N S

Milk DC Gard cover down from

eye the toward working end.

Tape 6 inches tightly at the throat of splice and 12 inches at base of DC Gard cover.

Seize twine over taped area.

See page 189 for more information on seizing.

10

G

10

H

10

I

Milk down

6"

12"

Apply two-part urethane over seized area.

10

J

Finished seizing

Finished seizing

Finished splice

Begin tucking DC Gard strand groups over 2 strands and under 3 strands (1 tuck) and

complete 4 tucks. Bury the remaining length of strand groups between DC Gard cover and

rope a minimum of 1/2 a fid length, trim DC Gard strand group flush with cover. Turn rope over

and repeat for the remaining strand group.

10

F

1/2 fid length

Trim

Advertising