System assembly, Trial running – Scilogex OS20-Pro User Manual

Page 7

Advertising
background image

5

Digital (Enhanced) Overhead Stirrer

4.System assembly

a.Install stand

The stand must be assembled

according to the following

instructions. Adjust the

height of the main unit, and

the distance from main unit

to the support holder by

rotating the locking device.

Anti-drop protector can be

adjusted up or down, ensure

the locking position is

suitable for fixing the main

unit, and then attach the

main unit to the stand.

Figure 1

b.Install stirring impeller

Plug the stirring impeller

into the drill chuck. Adjust

the stirring impeller which

is held in position securely.

Clockwise tighten the drill

chuck firmly using the

chuck key.

Figure 2

Note:

Overhead stirrer is a high-speed running device,

the system are required to lock securely the

corresponding components in each step of the

assembly to avoid any movement of the main

unit or stirring impeller which would be caused

harm or damage to peripheral instrument and

personnel.

5.Trial running

Follow the instructions below to trial operate:

Ensure the required operating voltage and power supply
voltage matched.

Ensure the socket must be earthed reliably.

Connect the power cable,ensure the power on and
begin self-checking.

Rotate the stirring button and set stirring speed.

Press stirring button and start stirring.

Press again the stirring button and stop stirring.

If these operations above are normal, the instrument is

ready to operate. If not, the instrument may be damaged

during transportation, please contact technical support of

manufacturer/supplier.

Advertising
This manual is related to the following products: