Install discharge chute / chute rotater, Assembly / pre-operation – Craftsman 944.528398 User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY / PRE-OPERATION

INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)

1, Retrieve vinyl sleeve and spring from bag of parts and

retrieve the auger control rod from carton chute tray.
Slide straight rod end through the small hole in the

vinyl sleeve. Hook spring in hole in rod end,

2, Hook end of spring into control arm with loop opening

up as shown, (See Fig, 5)

3,

With top end of rod positioned under right side of

control panel, push down on rod and insert end of rod
into hole in auger control bracket. Secure with retainer
spring.

INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD
(See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head,

1, Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower,

2, Position chute rotater head over chute bracket. If neces­

sary, rotate chute assembly to align square andpin on un­
derside of chute rotater headwith holes in chute bracket,

3,

With chute rotater head and chute bracket aligned,

position chute rotater head on pin and threaded stud
of mounting bracket,

4,

Install 3/8 washer and locknut on threaded stud and

tighten securely.

Advertising