Craftsman 113.24181 User Manual

Page 10

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

9.

Hold rod with one hand and with a 7/16 in. wrench or

pliers start screwing on ONE of the nuts only A TURN

OR TWO ... screw on other nut the same way.

10.

Using TWO 7/16 in. wrenches or pliers tighten both of

the nuts.

11. Slide the bars so that screws are in the MIDDLE of the

slotted holes.

12.

Position rip fence over miter gauge groove, holding up

the rear end while engaging front end with bar . ..

lower fence onto table.

13. Raise blade all the way up.

14. Carefully move fence against blade.

15.

Move

front

bar

until

“0"

mark

on

rip

scale

is

approximately at tip of pointer.

16.

Move FRONT bar upwards until fence is approximately

1/32 in. above table ... tighten screw at left end of

bar.

NOTE: Fold a piece of newspaper making

8

thicknesses

and place between rip fence and table to act as a spacer.

This will hold the fence off of the table approx. 1/32

in.

17.

Adjust rear bar so that the fence is approximately 1/32

in. above table make sure it is square with fence guide

bar rod ... tighten screw at end of bar.

18.

Replace screws in rear of table extension ... be sure

top surface of extension is PARALLEL to top surface

of rear guide bar.

8 THICKNESSES

OF PAPER

19.

Move fence to RIGHT edge of table ... make sure it is

approx.

1/32

in.

above

table

at

front

and

rear

and

tighten screws.

8 THICKNESSES

OF PAPER

10

Advertising