Step 2 position & install header bracket, Sectional door and 1-piece door with track, Installation – Craftsman 139.535006 User Manual

Page 11: Piece door without track, Step 2, Installation 1-piece door without track, Position & install header bracket

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation

STEP 2

Position & Install Header Bracket

THE HEADER BRACKET MUST BE RfGIDLY FASTENED TO THE HEADER WALL OR CElLtNG. REINFORCE

WALL OR CEILING WITH 2x4 IF NECESSARY.

Locate height for header bracket by opening door to
highest point of travel as shown. Draw a horizontal
line on header wall 2" above high point This height
provides travel clearance for top edge of door

When headroom is not sufficient for 2" clearance,

bottom edge of bracket may be placed parallel to the
high point of travel, or bracket may be attached to

ceiling

Optional Quick Turn Brackets are designed for low
headroom installations They replace top brackets
and rollers on the garage door, thereby lowering the
high point of door travel Installation instructions are
contained in the accessory carton
Position bracket as shown (bottom edge of bracket
on horizontal line), Mark either top and bottom or left
and right bracket holes Drill 3/16" pilot holes and
fasten bracket

Lag Screws

INSTALLATION

SECTIONAL DOOR AND

1-PIECE DOOR WITH TRACK

SECTIONAL DOOR

CURVED TRACK

Ceiling

^

Header

'(

Bracket

ONE-PIECE DOOR

HORIZONTAL TRACK

JAMB HARDWARE

Track

t

Highest Point

of Travel

Door

INSTALLATION

1-PIECE DOOR WITHOUT TRACK

ONE-PIECE DOOR

NO TRACK

PIVOT HARDWARE

Header

k-l / Bracket

ONE-PIECE DOOR

NO TRACK

•JAMB HARDWARE

Highest Point

ol Travel

Locate height for header bracket by opening door to
highest point of travel as shown. Measure distance

from top of door to floor. Subtract actual height of

door Add 8" to the remainder See example below.
If the total number of inches exceeds the height
available in your garage, use the maximum height
possible On finished ceilings, do not position the
bracket closer than 1/2" from ceiling.
Measuring from top of door, draw a horizontal line on
the header wall at the determined height Position
bottom edge of header bracket on horizontal line,
centering bracket on vertical line. Mark either top
and bottom or left and right holes. Drill 3/16" pilot

holes and fasten with 5/16" x 1-7/8" lag screws as

shown above

EXAMPLE

0>

Distance from top of door (at

c

highest point of travel) to floor

92"

w

Actual height of door

-88"

Q

Remainder

4"

Add

+

8"

''

Bracket height on header wail

=12"

11

Advertising