Assembly – Craftsman 139.53625SR User Manual

Page 8

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Assembly

DO NOT REMOVE CHAIN AND CABLE FROM CAFTTON,

Delach cable from side of carton and fasten to trolley with
a master fink from coin envelope,

MASTER LINK PROCEDURE: Push pins of master link
bar through loop of cable and hole in front end of trolley
(A) as shown. Push cap over pins and onto notches. Slide
clip-on spring over cap and onto pin notches until both pins
are locked in place.

Caation: fCeop the chain taut while instaiUng to help

prevent kinking.

With trolley against the screwdriver, dispense cable around
pulley. Proceed back around opener sprocket p)- be sure
sprocket teeth engage chain- and forward to the threaded
trolley shaft (C).

B

Opetw Chassis

Sprocket

insali Chain

(n This Direction

Use second master link to connect the chain to the flat
end of shaft as shown. Check to make sure chain Is not
twisted.
REMOVE SCREWDRIVER.

Master Unk

Ciip-On sprine

Master Unk

Clip-On Spring

Flat End

instali Chain and Cabie

In This Direction

Sprocket

Cover

Tab Skit

Mountins

Psaio

ATTACH SPROCKET COVER TO CHASSIS: insert back
IM

j

in chassis slot. Then bend cover forward and insert

front tab in slot provided on mounting plate-

Advertising
This manual is related to the following products: