Cub Cadet HP LS 27 CC User Manual

Page 9

Advertising
background image

9

s

ectiOn

2 — a

sseMbly

& s

et

-u

p

Lift and slide the cylinder up to the top of beam and into

16.

the weld brackets. See Fig. 3-6.

Attach the dislodger over the wedge assembly and secure

17.

it to the weld brackets with the previously removed

hardware. See Fig. 3-4.
NOTE: Lift up on the cylinder when installing the hex screws.
NOTE: Once the six hex screws are tightened, there may be

a slight gap between the dislodger and the weld brackets.

This gap is normal.
Reattach the log tray to the side of the beam with the

18.

control valve, aligning the holes in the tray with the holes

in the beam. See Fig. 3-7.

Check for and remove any staples on the bottom of the

19.

crate that may puncture the tire.

Cut the metal strap securing the log splitter to the bottom

20.

of the crate and remove the wood under the engine and/or

any other wood, then roll the log splitter off the bottom of

the shipping crate.
The control handle is shipped hanging from the valve on

21.

the handle link.
Remove the clevis pin and bow-tie cotter pin from the

22.

control handle. See Fig. 3-8.

Rotate the control handle into the operating position and

23.

secure with the clevis pin and bow-tie cotter pin removed

in step 22. See Fig. 3-8.

Hex Washer

Screw

Log Tray

Beam

Figure 3-7

Cylinder

Weld Brackets

Figure 3-6

Bow-Tie

Cotter

Pin

Control Handle

Clevis

Pin

Figure 3-8

Advertising