Jambs, Bumpers, Header – Coral Industries Freestyle Bypass (1/4 Frameless) - 2FG1-G User Manual

Page 3: Roller fin

Advertising
background image

2FG1-G 3/06

Position sill on centerline of tub with tall edge of sill
toward outside of tub. If necessary for a smooth fit, file
sharp corners of sill to fit contour of your unit. Tape sill to
tub with masking tape. This will help hold sill in place
while positioning jambs.

Place one jamb (B) against wall with short legs against
wall and notched end of jamb resting firmly on sill. Align
jamb vertically using a level and mark wall through
prepunched holes. Repeat procedure with remaining
jamb.

Remove jambs and sill from tub and drill where marked
using 1/8" drill bit.

Reposition jambs on tub and mount to wall using
8A x 1 1/4 " pan head screws (I). Top and bottom holes
are mounting positions for bumpers (H).

Measure from wall to wall (over the top of both jambs)
and cut header (C) to that measurement.

Lower header over jambs until seated squarely on legs of
both jambs.

8A x 1 1/4"

Pan Head

Screw

Level

Bumper

Jamb

Mark wall

through pre-

punched holes

and drill.

B

Centerline

File to fit

contour of

unit if

needed

Measure

Masking

Tape

OUTSIDE OF BATH

OUTSIDE OF BATH

I

Jamb

B

Jamb

B

Jamb

B

Jamb

B

Sill

A

Sill

A

Sill

A

H

2

Jambs

(B)

3

Bumpers

(H)

4

Header

(C)

To mount top channel/roller fin (M), align fin with top of
glass and mark through holes in glass. Drill where
marked using 1/4" drill bit in roller fin to match holes in
glass. Secure fin to glass with plastic post (N) and
10-32 x 3/8" pan head screw (O) provided.

Some units come with top channel/roller fin pre-
installed on door panels. If pre-installed on your
unit, proceed to next step.

Post

10-32 x 1/4"

Pan Head

Screw

M

Top Channel/
Roller Fin

N

O

5

Roller Fin

(M)

When anchors (J) are used holes should be drilled
using 3/16" drill bit. (Use masonry bit for tile.)

Header

Jamb

B

C

OUTSIDE OF BATH

Advertising