EFCO CORPORATION 6/2012 PART NO. Y304

Page 25 of 29

Series 5600 Inside Glazed Installation Instructions

Section XI: Vertical Splice Joints

Step #1 Locate Splice Joints

A.)

Splice joints should occur at the spandrel areas (if possible). Refer to Approved Final

Shop Drawings for actual locations.

B.)

Depending on the specific job requirements, splice sleeves may be shop or field
assembled in the top of the lower mullion. If materials are field fabricated, use the

following assembly instructions. Where head clearance is sufficient to allow the top
mullion to be lifted over the splice sleeve, a retractable sleeve will be used. The

sleeve is to be taped into the bottom of the top mullion and dropped down to the

stop screw in the mullion below.

C.)

The splice joint width should be based on the sealant movement capabilities and the

following formula:

D.)

Refer to this section for cover splice, pressure plate splice relative locations, and

sealing instructions.

E.)

Once a final check of expansion joint placement and mullion position is made, the

final match drilling of mullion through anchor holes may be completed.

Plan View – Mullion Splice

Splice sleeve

stop screw

Mu

lli

on

L

en

gth

Cover Le

ngth

4

2”

As

Req’d

1 1/2

1/

2

Pressure P

late

3” Min

.

Field install backer rod

at the pressure plate

joint to back-up sealant

Mullion splice sleeve
with bond breaker tape

Side View – Mullion Splice

1” Minimum

Pressure

plate screw

Mu

lli

on

L

en

gth

Pressure P

late Le

ngth

Cover Le

ngth

As

Req’d

2”

4”

.

2”

See page 27 for multiple isometric

views of splice assembly.

Linear expansion for aluminum in inches=

Length (inches) X Degrees (F) Temperature Range X .0000129