5 fixed 5th wheel mounts – Rice Lake Combination System - Precision Loads On-Board Weighing Systems User Manual

Page 34

Advertising
background image

Minimum Plate
Thickness 0.50”

Plate welded to
modified hanger must
clear equalizer by at
least 0.50”

0.50”

0.50”

Face load
cell output
inwards

Replace tube with solid
shaft. Weld shaft on
outside of hanger.

30

Precision Loads On-Board Weighing Installation & Service Manual

Figure 4-25. Hutch Hanger Install

Note

When handling load cells, care must be taken to protect the output cable from damage. When welding load
cell bearing plates, the load cells must be removed and all cables must be away from any heat or flame.

Concerning triaxle and quad-axle suspensions, two load cells are used per side (four load cells total) at the

center equalizer hangers. Triaxle suspension hanger mount load cell installations may not operate as well in some off-level
ground conditions as on flat, level surfaces.

Inspecting the Installation

Ensure that all leaf springs seat properly on their wear pads and their positioning within the equalizer is correct.
Check all bolts of the hanger, equalizer and torque arm to make sure they are all tight to manufacturer's
specifications.

4.5

Fixed 5th Wheel Mounts

Preliminary Information

If tractor has a slider assembly, remove it completely, except for the outer frame angles. Standard Rice Lake
Weighing Systems 5th wheel load cell systems are for fixed mounting only. Contact Rice Lake Weighing Systems
for information on slider assemblies.

Figure 4-26. 5th Wheel Mounts

Advertising
This manual is related to the following products: