0 installation, 1 unpacking the benchmark, 1 leveling the scale – Rice Lake BenchMark HD User Manual

Page 7: 2 connecting the load cell cable, Table 2-1. load cell wiring

Advertising
background image

Installation

3

2.0

Installation

The following sections explain the installation procedure for the Benchmark HD.

2.1

Unpacking the Benchmark

Immediately after unpacking, visually inspect the Benchmark HD to ensure that the unit is undamaged. The

shipping carton should contain the bench scale and this manual. If the scale was damaged in shipment, notify Rice

Lake Weighing Systems and the shipper immediately.

2.1.1

Leveling the Scale

Place the scale in the desired location. Lift off the deck cover and locate the bubble level (see Figure 2-1).

Figure 2-1. Top Plate Removed Showing Bubble Level Location

Adjust the four corner feet until the scale is level and all feet contact the support surface, so that the scale does not

rock. Lock the jam nuts on the feet when the final level is correct.

2.2

Connecting the Load Cell Cable

The Benchmark HD comes with a standard 10 feet of color-coded load cell cable. Do not cut this cable. The load

cell is temperature compensated for an exact length of 10 feet.
See your indicator manual to determine the proper load cell cable input connectors. Use the following color codes
to wire the load cell cable. Once complete, install the top cover for the bench scale back onto the scale.

6-Wire Color Code

Function

Red

+ Signal

White

- Signal

Green

+ Excitation

Grey

- Excitation

Blue

+ Sense

Brown

- Sense

Yellow Shield

Table 2-1. Load Cell Wiring

Benchmark HD Deck Cover

Bubble Level Location

Advertising