Assembly Instructions

3

1. Position the four fulcrum stands (Figure 2-1) on the concrete base with gussets facing outward from the

scale. Ensure fulcrum stands are square and level with each other.

Note

If mounting the scale to a frame, ensure the frame is square and all stands are positioned squarely on the
frame.

2. Assemble the load cell, ITCM hardware, and center connection shackle to support the nose irons, see

Figure 2-2.

3. Temporarily secure load cell assembly with top and bottom jam nuts on top plate of load cell stand.

Jam Nuts

Center Connection

Shackle

ITCM Hardware

Nose Irons

Load Cell Stand

Figure 2-2. Load Cell Assembly

4. Loosely bolt nose irons to ends of main pipe levers.
5. Set pipe levers in place with outside pivots on bearings of fulcrum stands (see Figure 2-3) with nose irons

supported by center connection shackle in load cell stand.

Grider Chair

Bearing

Fulcrum
Stand Bearing

Outside Pivot

Inside Pivot

Spool

Trunnion Pin

Fulcrum Stand

Type II

Grider Chair

Bearing

Fulcrum
Stand Bearing

Outside Pivot

Inside Pivot

Spool

Trunnion Pin

Fulcrum Stand

Type I

Important

Center load cell stand between main levers. Levers must be level when suspended by the center
connection shackle.

Figure 2-3. Fulcrum Stand Assembly

6. Locate and assemble the loop assembly spool using two bolts and two washers. Position loop assembly

under inside pivot. Attach bearing to two loop side plates using two clevis pins and two cotter pins with

loop bearing resting on inside pivot. Insert trunnion pin.

Important

Bolt heads must face the fulcrum stands.