Junction box connections – Rice Lake RLC Stainless Steel User Manual

Page 7

Advertising
background image

5

2.

Provide a drip loop in all cables so that water or other liquids will not run
directly down the cables onto either the load cells or the junction box.
Attach load cell cable to the dead structure, not the vessel.

3.

If conduit protection is necessary against mechanical or rodent damage to
the load cell cables, use flexible conduit and conduit adapters at the load
cells.

4.

Connect cables to the summing board in the junction box according to the
guide shown below and the labels on the terminal strips of the junction box.
To verify the wiring scheme, see the certification shipped with each load
cell.

5.

For better performance, use positive and negative remote sense lines if the
wiring running from the juction box to the indicator is longer than 25 feet.

ll

e

C

d

a

o

L

n

o

i

t

c

n

u

F

k

n

i

P

C

X

E

+

y

e

r

G

C

X

E

n

w

o

r

B

G

I

S

+

e

t

i

h

W

G

I

S

e

r

a

B

D

L

E

I

H

S

Drip Loop

4. Junction Box Connections, Adjustments & Calibration

1.

Refer to the Junction Box manual for trimming details.

2.

Refer to the indicator manual for system calibration details.

Advertising