Install Conduit, Cabling, and J-Boxes

15

8.0

Install Conduit, Cabling, and J-Boxes

Load cells are supplied with 60' cables. Since each cell is temperature-compensated for the supplied cable length,
do not change any cable length. There will be room to coil excess cable inside the junction box after making final
connections.

All cabling must be enclosed in 3/4" weatherproof conduit from the load cell to the junction box in accordance with
applicable electrical codes. NEMA 4 junction boxes are supplied from the factory with 30" sections of flexible
conduit and waterproof conduit adapters where necessary to maintain NEMA 4 integrity.

Figure 8-1. J-Box Wiring and conduit Runs for a Four Section/Three Module Scale

Load Cell
Cable to
Connector

Pocket 1 Conduit

Pocket 8 Conduit

Pockets 1, 2, 3, 4
Conduit runs to J-Box

Pocket 5 Conduit

Module A

Module B

Pocket 3 Conduit

1

8

2

7

SI - Green

SI - White
EX - Red
EX - Black

SHD - Shield

+

-

+

-

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

J3

J4

J7

J8

J6

J5

J2

J1

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

+SI

-SI

+EX

-EX

SHD

Load Cell #1

Load Cell #3

Load Cell #8

Load Cell #6

Load Cell #2

Load Cell #4

Load Cell #7

Load Cell #5

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

SHD - Shield

+SI
-SI

+EX

-EX

SHD

-SEN

+SEN

Indicator/J10

Expansion/J9

Cable to Indicator

SI - Green

+

SI - White

-

EX - Red

+

EX - Black

-

SEN - Yellow

-

SEN - Blue

+

Pocket 4 Conduit

Pocket 6 Conduit

6

3

Pocket 4 Conduit

Pocket 5 Conduit

5

4

Module C