Operation guide notice – Tycon Power TP-SCPOE-24xx-HP Series User Manual

Page 4

Advertising
background image

User’s Manual

TP-SCPOE-24XX(-HP) Series


Operation Guide

NOTICE:

1. Connect the battery to the BAT terminal. Make sure the polarities are

correctly connected. Sequentially connect the solar panel to SOL terminal
and connect POE source to PoE input (lower) jack. (If solar panel or PoE
source is installed before the battery, and if the polarities of the battery be
reversed, then the fuse will be burnt.)

2. Make sure the battery is properly connected to the unit. If no battery is

connected, then the voltage at BAT terminal will be approx 27.3+0.5V

3. The solar panel cannot be used stand alone without battery connected.

4. When a solar panel and PoE input are connected to the charger, if the

voltage of solar panel is higher than 30V, then solar panel is always the
main power source of the charger.

5. When charge from solar panel, as the battery full and turn to floating

stage, the CHA light will start flash.

6. When charge from PoE, as the battery full, the CHA light will be turn off, if

the CHA is always flash, that means the input wattage lower than the
required minimum wattage. If only charge battery, the minimum PoE input
wattage is 94W, if full load, the minimum PoE input wattage is 160W.

7. When battery connect to BAT terminal and with valid voltage, then the

LOA indicator will always light on even no load connected.


8. The V- of PoE input, Solar input, and battery(-) are not the same grounding, must be

properly isolated.










Advertising