Figure 4.17: Stainless Steel Vacuum Breaker / Supply Box

Figure 4.18: Poly Vacuum Breaker / Supply Box

4.11

Control Function Test

The machine should be cleaned after the installation is complete. A function test should then be
executed on the unloaded machine as follows:

1. Check the proper supply for such characteristics as correct voltage, phase, and cycles to be

certain they are correct for the machine.