Maintenance, Daily, Beginning of day – B&C Technologies HE Series Commercial User Manual

Page 42: Chapter 6 maintenance, 1 daily

Advertising
background image

Chapter 6

Maintenance

Routine maintenance maximizes operating efficiency and minimizes downtime. The maintenance
procedures described below will prolong the life of the machine and help prevent accidents.

Daily, weekly, monthly, and quarterly checklist are provided at the end of this section. Laminate
the checklists to preserve them for repeated copying. Operators and technicians are encouraged
to add checks specific to their machines particular application. When possible, space is provided
on the checklists for this purpose.

The following maintenance procedures must be performed regularly at the required intervals.

6.1

Daily

6.1.1

Beginning of Day

1. Inspect water inlet valve hose connections on the back of the machine for leaks.

2. Inspect steam hose connections for leaks, where applicable.

3. Verify that insulation is intact on all external wires and that all connections are secured. If

bare wire is evident, call a service technician.

4. Check door interlock before starting operation:

(a) Attempt to start the washer with the door open. The washer should not start with the

door open.

Replace all panels that are removed to perform service and maintenance pro-
cedures. Do not operate the machine with missing guards or with broken or
missing parts. Do not bypass any safety devices.

38

Advertising