Bradford White TW4-75S-76B-3N User Manual

Page 18

Advertising
background image

18

Venting (Part I) continued-

TABLE 3

3” (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR

LOW GROUND CLEARANCE INSTALLATIONS

Terminating #

of

Elbows

Max Straight
Length
ft (m)

Min

straight

Length

ft (m)

48,65 gal.

(2) 90

 Elbows with (1) 90 Elbow

1 40 (12.2) 5

(1.5)

(2) 90

 Elbows with (1) 90 Elbow

2 35 (10.7) 5

(1.5)

(2) 90

 Elbows with (1) 90 Elbow

3 30 (9.1) 5

(1.5)

(2) 90

 Elbows with (1) 90 Elbow

4 25 (7.6) 5

(1.5)

TABLE 4

4” (10.2 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR

LOW GROUND CLEARANCE INSTALLATIONS

Terminating (Reduce 4” to 3”)

(Reduce 10.1 cm to 7.6 cm)

# of

Elbows

Max straight
Length
ft (m)

Min

straight

Length

ft (m)

48,65 gal.

(2) 90

 Elbows with (1) 90 Elbow

1 160

(48.8) 10 (3.1)

(2) 90

 Elbows with (1) 90 Elbow

2 155

(47.2) 10 (3.1)

(2) 90

 Elbows with (1) 90 Elbow

3 150

(45.7) 10 (3.1)

(2) 90

 Elbows with (1) 90 Elbow

4 145

(44.2) 10 (3.1)

(2) 90

 Elbows with (1) 90 Elbow

5 140

(42.7) 10 (3.1)


HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,500
FEET (762 m)
ABOVE SEA LEVEL

The capacity of the induced draft blower declines with increasing altitude due to
a reduction in the air density. In order to assure safe and reliable performance
of the water heater, contact the supplier for high altitude kit.

Advertising