Coffee brewing instructions, Touch screen control module – Wilbur Curtis CGC User Manual

Page 2

Advertising
background image

2

1. Brewer should be ON (Confirm at the rear toggle switch). The screen should read Ready to Brew.

2. Place an empty cup under the brewcone.

6. Select the desired coffee

size. Touch and hold for two

seconds to start brewing.

5. Slide the filled brewcone into

the brew rails on the brewer.

3. Place a clean filter into the

brewcone.

4. Fill brewcone with the

proper amount of ground

coffee.

COFFEE BREWING INSTRUCTIONS

WARNING TO AVOID SCALDING, Do not remove brewcone while brew light is flashing.

Touch Screen Control Module

The touch screen turns on when power is available to the controller. The screen will contain standard control feature such as symbols and buttons. Pressing these elements with

your finger tip will activate the programming functions. The default screen, as well as some added control buttons are shown in the illustration below.

STATUS LIGHTS

BREW BUTTONS

CURTIS LOGO

TO ENTER PROGRAMMING

Tap Curtis logo 5 times to bring

up the ACCESS CODE screen.

RETURN TO HOME

SCROLL

RETURN TO PREVIOUS

CONTROL SYMBOLS

All of these symbols may

not be visible at one time.

Your Curtis Gold Cup Series is Factory Pre-Set for Optimum Performance.

After connection to water and power; turn on the brewer at the rear toggle switch. You will hear a beep and the status lights will come on for a moment.

The screen will display

. Next

is displayed. Water will fill the tank (2-3 minutes depending on water flow rate).

When the proper level is reached

will appear on the screen. It takes approximately 30 minutes to reach the set point temperature.

Control will display

when temperature reaches the set point. The unit is now ready to brew.

MODEL NUMBER

CONTROL BD NUMBER

READY TO BREW

HEATING

FILLING

Advertising