Program menu tree – Wilbur Curtis GEMTS User Manual

Page 2

Advertising
background image

2

Your Curtis Brewing System is Factory Pre‑Set for Optimum Performance.

After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.

The control displays

. Press ON/OFF button and the screen will display

. After three seconds,

is displayed.

Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached

will appear on the

screen. It takes approximately 20 minutes to reach setpoint temperature of 200°F.

Control will display

when temperature reaches the setpoint (200°F). Unit is now ready to brew.

<GEMINI TWIN>

WILBUR CURTIS

CURTIS

CURTIS

FILLING

CURTIS

HEATING

CURTIS

READY TO BREW

Program

Menu Tree

All programming selections are performed with the three center buttons.

The symbols below the buttons are:

Scroll LEFT

SELECTION or ENTER to save new parameter

Scroll RIGHT

IMPORTANT NOTE:

Advertising