System installation requirements – Beckett 61583 CleanCut User Manual

Page 2

Advertising
background image

Remove the shutter tab by using a pair of side cutter pliers and
fi le sharp edges fl ush with burner surface. This will permit the
shutter to be locked securely.

Install the air shutter using the screw located below the pump.
Adjust the shutter to the original air setting and tighten screw
securely.

NOTICE

On older burners, do not install the top shutter

screw, it will interfere with the solenoid on the fuel unit.

To install a CleanCut fuel unit on a housing that has two top shut-
ter mounting screw holes, make sure the screw is installed in the
hole on the left that is closest to the front of the burner (air tube
side).

Other Mounting Installations: The CleanCut Pump with a
standard cord set or a PD Timer can be installed on the following
burners: Carlin EZ-1, Wayne ’M’, Wayne ’E’, Wayne ’HS’, Ducane
’DM’, or Aero.
Ducane ’DR’: 5/16” diameter hole will have to be drilled into the
housing through the wire cavity.
Weil ’QB’: The valve coil blocks the air shutter screw. Allow
enough slack in the cord set in order to pivot the valve coil away
from the housing.

SYSTEM INSTALLATION REQUIREMENTS

ONE-PIPE SYSTEM

WIRING INSTRUCTIONS

Lift - ‘H’ in

Figure 4

(ft)

Run - ‘R’ in Figure 4

Single Stage Pump

(4GPH)

Run - ‘R’ in Figure 4

Two-Stage XL Pump

(4GPH)

3/8” OD

tubing

1/2” OD

tubing

3/8” OD

tubing

1/2” OD

tubing

0

84’

100’

93’

100’

2

73’

100’

85’

100’

4

63’

100’

77’

100’

6

52’

100’

69’

100’

8

42’

100’

60’

100’

10

31’

100’

52’

100’

12

21’

83’

44’

100’

14

-

41’

36’

100’

16

-

-

27’

100’

18

-

-

-

76’

REPLACEMENT PARTS

Item

Beckett Part Number

Strainer/Gasket

51974U

Valve stem

21877U

Valve Coil (115vAC)

21755U

Valve Coil (220/240vAC)

21756U

Valve Coil (12vDC/24vAC)

21754U

PD Timer

21887U

Valve Cord Set

21807

WHITE

VIOLET

Figure 5

Figure 4

TWO-PIPE SYSTEM

Remove 1/16” pipe bypass plug from plastic bag attached to unit.
Remove 1/4” plug from return port. Insert by-pass plug. Attach
return and inlet lines. Start burner – Air bleeding is automatic.
Opening air bleed valve will allow a faster bleed if desired. Re-
turn line must terminate 3-4” above supply line inlet. Failure to
do this may introduce air into the system and could result in the
loss of prime.

‘R’

‘H’

MAXIMUM 1 PIPE (H)

LIFT: 8FT

!

DO NOT Install bypass plug - the shaft seal will rupture!

Connect inlet line to pump inlet. Start burner. Arrange primary
burner control for continuous operation during purging. Open
bleed valve 1 turn CCW. Bleed unit until all air bubbles disap-
pear. Notice: Hurried bleeding will impair effi cient operation of
unit. Tighten bleed valve securely.

The Clean Cut fuel unit may be installed with a Gravity or Lift Oil
Supply System. The maximum allowable lift is 8 ft.

IMPORTANT: One pipe installations must be absolutely air tight
or leaks or loss of prime may result. Bleed line and fuel unit
completely. Bleed for 15 seconds after last air is seen from bleed
/ gauge port to be certain lines are air free.

L = line Length in Feet H = Head in Feet Q = Firing rate in GPH

3/8” Line L =

*6-.75H 1/2” Line L = *6-.75H

.0086Q

.00218

Q

* If tank is above pump, change – to +. Fittings, valves and fi lters
will reduce total length allowed.

!

SOLENOID WIRING

Disconnect power supply before wiring to prevent elec-
trical shock or equipment damage.

Lead wires on these devices are long enough to reach the junc-
tion box on most burner installations. Note: check the burner
manufacturer’s installation sheets for correct solenoid wiring.
(See Figure 5). All electrical work must be done according to lo-
cal and national codes. (Solenoid 115V, 0.1 amp, 60 HZ)

Figure 3

SK9858

SK9859

Advertising