Installation checklist – Dynon Avionics EFIS-D10 Installation Guide User Manual

Page 23

Advertising
background image

EFIS-D10 Installation Manual

EFIS-D10 Installation Guide

Doc Num: 100006-000

Rev. C

9/11/2003 Page

23 of 24

Installation Checklist
___ 1.

Select EFIS-D10 mounting location

___ 2.

(If applicable) Select external EDC-D10 probe location

___ 3.

(If applicable) Select outside temperature sensor location.

___ 4.

T off and connect static and pitot lines to ports on back plate of EFIS-D10. The ports
are labeled “A” (AOA), “P” (pitot), and “S” (static)

___ 5.

(If applicable) Install EDC-D10 Electronic Digital Compass and route connecting
cable.

___ 6.

Complete connections to 25-pin D-Sub plug.

___ a)

Connect separate power to pin from circuit breaker or fuse

___ b)

Connect RS232 serial port cable

___ c)

Connect EDC-D10 Electronic Digital Compass bus wires (optional)

___ d)

Do a test run of all electrical connections

___ e)

Connect and route RS232 serial port wire to convenient location for PC
communication

___ 7.

Install EFIS-D10 in 3-1/8” instrument hole. Install nuts behind rear of panel or flush
mount bracket to secure EFIS-D10 in place.

___ 8.

Use the EFIS-D10 support program to modify customer parameters such as
checklists, current location dip angle, and airspeed color bar thresholds.

___ 9.

Perform EFIS-D10 magnetometer calibration.

Advertising