Dip switch settings – Steffes Comfort Control Relay Panel (CCRP) User Manual

Page 9

Advertising
background image

Page 6

Comfort Control Relay Panel (CCRP)

DIP SWITCH SETTINGS

(If using the built-in PLC Transmitter Feature for Control)

If the power line carrier (PLC) transmitter in the CCRP is being utilized for the control of the 1000 and/or 2000
series heater(s), dip switches 1, 2, 3, 4, 6, and 8 on the heater’s circuit board MUST be set to the "OFF” position.

DIP SWITCH 1: INVERT PEAK

This dip switch is used to match the utility’s signaling device to the Steffes microprocessor based heating
equipment and the Steffes PLC Receiver(s) for peak control purposes.

FACTORY DEFAULT SETTING = ON

Off = An open utility switch will signal an off-peak time to the heater (charging is enabled in the ETS

heater). A closed utility switch will signal an on-peak time (charging is disabled in the ETS heater).

On = A closed utility switch will signal an off-peak time to the heater (charging is enabled in the ETS

heater). An open utility switch will signal an on-peak time (charging is disabled in the ETS heater).

The peak control signal is a priority signal. When the room heating units or mini receiver
controlled devices are receiving a peak signal, an anticipated peak signal will be overridden.

DIP SWITCH 2, 3, 4, AND 5: TRANSMIT CHANNEL

The transmitter built into the Steffes CCRP is capable of transmitting on one of fifteen channels. The dip
switch settings in the CCRP must be set to match the channel setting of the receiving device(s).

To select the power line carrier communication channel desired use the chart below and set dip switches 2, 3,
4, and 5 to the appropriate positions. If dip switches 2, 3, 4, and 5 are all set to the "OFF" positions, the CCRP
will not transmit a power line carrier signal.

FACTORY DEFAULT SETTING = CHANNEL 3 (2 ON, 3 ON, 4 OFF, 5 OFF)

1. If utilizing the built-in PLC transmitter, a specific channel MUST be selected.
2. 1000/2000 Series heaters will ONLY receive on slow speed channels.
3. If multiple transmitters are installed on the same distribution transformer, do not use both

channels one and two. Select one of these channels along with another available "slow"
channel.

C

HANNEL

D

IP

S

WITCH

#2

D

IP

S

WITCH

#3

D

IP

S

WITCH

#4

D

IP

S

WITCH

#5

C

HANNEL

S

PEED

0

OFF

OFF

OFF

OFF

N/A

1

ON

OFF

OFF

OFF

SLOW

2

OFF

ON

OFF

OFF

SLOW

3

ON

ON

OFF

OFF

FAST

4

OFF

OFF

ON

OFF

FAST

5

ON

OFF

ON

OFF

FAST

6

OFF

ON

ON

OFF

FAST

7

ON

ON

ON

OFF

FAST

8

OFF

OFF

OFF

ON

FAST

9

ON

OFF

OFF

ON

FAST

10

OFF

ON

OFF

ON

FAST

11

ON

ON

OFF

ON

FAST

12

OFF

OFF

ON

ON

SLOW

13

ON

OFF

ON

ON

SLOW

14

OFF

ON

ON

ON

SLOW

15

ON

ON

ON

ON

SLOW

Advertising