Step 1: Mount Frame to

Wall
Scribe a horizontal line on the
wall showing the exact
location of where the top edge
of the upper left monitor will
be. Measure down 2.1”
(53.34mm)
from that line and
scribe another horizontal line
showing where the top edge
of the mounting frame will be

(Figure 1).


Scribe a vertical line showing
where the left side of the
upper monitor will be.
Measure to the right and
scribe another vertical line
15.5” (393.6mm) to locate the
left edge of the vertical
mounting channel (Figure 1).

Using a level, place the frame
up to the vertical and horizontal mounting frame
scribe lines. Use the frame as a template to mark
the six primary mounting key-holes.

Place the frame back on the floor and install wall
fasteners, leaving at least ¼” (7mm) of the bolt’s
shaft exposed (Figure 2).

Replace and level the mount on the wall and install
additional wall fasteners to the top, lower
horizontal slots and the center hole of the vertical
mounting channel. Tighten wall fasteners
permanently.

Step 2: Install Media Player (Optional)
Choose and remove the bottom left or right horizontal frame
channel by unscrewing its flat head screws (Figure 3). Install the
media player to the wall between the two vertical channels using
the appropriate fasteners through the media player’s brackets
(Figure 3). Re-install the bottom channel.