3 site preparation, 1 preinstallation considerations – Compaq EK-ASIP2-OG. D01 User Manual

Page 24

Advertising
background image

Installing the AlphaServer IP Platform Hardware

2–2 AlphaServer Intelligent Peripheral Platform Hardware Owner's Guide

2.3 Site Preparation

This section describes the site-specific installation requirements for the IP Platform.

_____________________________Caution___________________________

Review your system warranty. It may require that a Compaq service
representative install your system to prevent damage to equipment or software.

_______________________________________________________________

____________________________ Achtung __________________________

Überprüfen Sie die Garantie Ihres Systems. Eventuell muß Ihr System, gemäß der
Garantie, vom Compaq-Kundendienst installiert werden, um Beschädigungen am
Gerät oder an der Software zu verhindern.

_______________________________________________________________

2.3.1 Preinstallation Considerations

Before you install the AlphaServer IP Platform, ensure that:

The installation site meets the specifications and environmental conditions listed in
Appendix A. For more information about planning and preparing the installation site for
a computer network for a free-standing system, refer to the Site Environmental
Preparation Guide.
(PN EK-CSEPG-MA. Available by calling 1-800-344-4825.)

The power source is correct for your system, and is one of the following models: 120
Vac, 250 Vac, or -48 Vdc.

You have the correct number of T-1, E-1, or loop-start network connections and adequate
cabling.

______________________________ Note ____________________________

The T-1 cable length from the network to the AlphaServer IP Platform cannot
exceed 199.6 m (655 ft) without a repeater. Do not use a repeater for cable
lengths less than 199.6 m (655 ft).

_______________________________________________________________

The system is located in an area that provides 61 cm (24 in.) clearance from the rear of
the cabinet, and 76.2 cm (30 in.) from the front of the cabinet for ventilation and
servicing.

Personnel are appropriately trained in the installation and operation of this system.

Advertising