California Faucets Diverter for Roman Tub User Manual

Page 2

Advertising
background image

NOTE: Hot & cold valves are labeled: cold=blue & hot=red.
-Remove top nut and turn bottom nut with fiber washer down

the valve until it stops.

-Insert valve through hole from below and install top nut

(if applicable), and adjust to proper height, see Fig. 4A
(also refer to "A" dimension).

-Tighten the bottom nut to secure the valve.
-Install trim parts (base ring if applicable), escutcheon and

handle and tighten handle set screws with Allen key provided.
REMINDER: Please retain allen key as handles may
require re-tightening with normal use.

Fig. 4A

Install valve bodies:

Installation Note for series:

# 32, 33, 34, 35, 36, 43, 57, 60, 61, 67, 68 & 69.
The trim to those products do not require a top nut to be installed
on the valve (See Fig. 4A)
The decorative base ring and escutcheon takes the place of the
top nut. (See Fig. 4B).

Fig. 4B

Top
Nut

Fiber Washer

Bottom Nut

Valve Body

"A"

Sink/
Countertop

Decorative
Base Ring

Valve

P2

"A"

DIMENSION

"A" Dimension is
from top of counter/tub
top to tip of stem broach.

Series #

Handle Diverter

3408 2 3/8" 2 3/8"
3508 2 3/8" 2 3/8"
3608 2 3/8" 2 3/8"
3808 2 5/8" 2 5/8"
4008 2 5/8" 2 5/8"
4208 2 5/8" 2 5/8"
4408 2 3/8" 2 3/8"

4608 2 1/2" 2 1/2"
4708 2 1/2" 2 1/2"

5008 2 1/4" 2 1/4"
5108 2 1/2" 2 1/2"
5308 2 1/4" 2 1/4"
5508 2 5/8" 2 5/8"
5708 2" 2"
5808 2 5/8" 2 5/8"
5908 2 5/8" 2 5/8"
6008 2 1/4" 2 1/4"
6108 2 1/4" 2 1/4"
6208 1 1/8" 1 1/8"
6308 3" 3"
6408 2 5/8" 2 5/8"
6508 2" 2"
6608 2" 2"
6708 2 1/4" 2 1/4"
6808 2 3/8" 2 3/8"
6908 2 3/8" 2 3/8"

3

-Remove threaded nipple from spray holder. Insert threaded
nipple up through deck, keeping lock nut, steel washer and rubber
washer facing up towards deck from below. (See fig. 5)
-Reattach spray holder to threaded nipple and lock down from below.
-Insert handshower hose with hex nut end first.
-Ensure rubber washer is in the conical female receptacle
of the handshower hose and thread into the hand shower elbow.
-Place fiber washer between handshower and the handshower
elbow and thread together.
-Ensure rubber washer is in hex nut end of flexible hose and connect
to 1/2" out port of the diverter valve, (connections not provided).
-Install piping (not supplied) to connect valve, spout and diverter
(See Fig. 1 for piping diagram. See Fig. 6A for inlet/outlet configuration
of diverter
).

NOTE: The manufacturer recommends these connections be made in

hard copper.

Install spray holder and hand-held shower:

Fig. 5

Fig. 6A

Elbow

Conical
Receptacle

Spray
Holder

Steel Washer

Rubber Washer

Lock Nut

Threaded Nipple

Hex Nut

Hand Held
Shower
Hose

Stop Pin

Cartridge

Bottom Nut

Outlet:
3/4" NPT Male
or 3/4" Copper
Sweat

Inlet:
3/4" NPT Male
or 3/4" Copper
Sweat

Oulet:

1/2" NPT Male

or 3/8" NPT
Fem

Hub

Broach

All
Thread

Stop
Ring

Deck Diverter Installation

4

-Remove All-thread, Broach, Trim Nut and Hub from Body.
-Hole diameter size in deck or tub needs to be 1-1/2"
-Insert Body through the hole from underside and reinstall the
Hub (hand tight only) until it stops against the O-Ring on Body.
-Align the Body into the desired postition to allow easy connection
access to ports, pull Body down and tighten the Bottom Nut securely.

Connection types: NPT Thread (or) copper sweat "solder"
-For solder connections either directly to the valve, or within 6" of the valve,

the CARTRIDGE MUST BE REMOVED from the body. When soldering do
not apply excessive heat directly to the body. WARNING: Failure to follow
these directions can cause damage to the body and/or cartridge, and
will nullify the warranty.

-Fit the Broach to the Cartridge and rotate counter-clockwise until it stops.
-Use a permanent marker to locate the Stop Pin on the Hub (See Fig. 6B).
-Remove Broach and Cartridge with stop ring from the Body.
-Connect the mixed water from valves to the bottom 3/4" inlet.
-Connect the 3/4" outlet on side to the tub spout.
-Connect 1/2" outlet on side to the hand shower hose.
-After Body has cooled, reinstall the Cartridge carefully and align Stop Pin with
the mark on the Hub (See Fig. 6B). Use Broach if neccessary to rotate the
Cartridge for alignment.
-Install the Stop Ring in top of Body (fit one way) and push down into notches.
-Install Trim Nut, Broach and All-thread (do not overtighten All-thread).

NOTE: Prior to trim installation, it may be necessary tp cut Broach and

All-thrad to dimension "A", All-thread shall be cut 1/2" less than Broach.
-Install trim (base ring if applicable), escutcheon, handle and tighten setscrews.

2

Fig. 6B

Trim
Nut

O-Ring

Diverter

Valve

Deck

Stop
Pin

Mark

Notches

E208

2 11/16"

2 11/16"

3208 2 3/8" 2 3/8"
3308 2 3/8" 2 3/8"

4808,X 2 5/16" 2 5/16"

4508 2" 2"

RT.1_ii_140122

Advertising
This manual is related to the following products: