Cylinder head installation – Cub Cadet MTD P90 Series User Manual

Page 92

Advertising
background image

P90 Series Vertical Shaft Engines

86

Cylinder head installation

1.

Place a new head gasket on the cylinder, allowing
the alignment dowels to hold it in place.
See Figure 9.7.

NOTE: The 4P90 series of engines use a metal

head gasket with rubber seals.

2.

Position the cylinder head on the engine block.

3.

Install the 4 head bolts, and tighten them to a step
torque of 41 - 44 ft lbs. (55 - 60 Nm) in an alternating
diagonal pattern. See Figure 9.8.

NOTE: The bolt closest to the exhaust valve must

be the last bolt tightened. Failure to do so
can result in the head bolt loosening up.

NOTE: The head bolts have a self locking thread

form.

4.

Insert the push rods.

5.

Install the rocker arms.

6.

Adjust the valve lash by following the steps
described in Chapter 1: Introduction.

7.

Install the baffle.

8.

Install the muffler by following the steps described in Chapter 8: Exhaust.

9.

Install the carburetor and engine shroud, using new gaskets, by following the steps described in Chapter 3: Air
Intake

10.

Test run the equipment in a safe area before returning it to service. Check all safety features.

Figure 9.7

Dowel pins

Figure 9.8

Exhaust

port

2

3

4

1

Advertising