4.6 Laying suction and discharge lines

INFO!

Proper layout of the suction and discharge lines directly after

the compressor is integral to the system’s smooth running and

vibration behaviour.

ATTENTION! Improperly installed pipes can cause cracks and tears, the result

being a loss of refrigerant.

A rule of thumb:
Always lay the first pipe section starting from the shut-off valve

downwards

and parallel to the drive shaft.

4.5 Pipes

Pipes and system components must be clean and dry inside and free of scale, swarf and layers of

rust and phosphate. Only use air-tight parts.

Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being

cracked and broken by severe vibrations.

Ensure a proper oil return.
Keep pressure losses to an absolute minimum.

Rigid
Fixed point

As short as
possible

Fig. 16