Install the header bracket, Installation step 2 – Chamberlain CG40DM User Manual

Page 13

Advertising
background image

13

INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall above
the garage door, or to the ceiling. Follow the instructions
which will work best for your particular requirements. Do
not install the header bracket over drywall. If installing
into masonry, use concrete anchors (not provided).

WALL HEADER BRACKET INSTALLATION

1. Center the bracket on the vertical centerline with the

bottom edge of the bracket on the horizontal line as
shown (with the arrow pointing toward the ceiling).

2. Mark the vertical set of bracket holes. Drill 3/16" pilot

holes and fasten the bracket securely to a structural
support with the hardware provided.

CEILING HEADER BRACKET INSTALLATION

1. Extend the vertical centerline onto the ceiling as

shown.

2. Center the bracket on the vertical mark, no more

than 6" (15 cm) from the wall. Make sure the arrow
is pointing away from the wall. The bracket can be
mounted fl ush against the ceiling when clearance
is minimal.

3. Mark the side holes. Drill 3/16" pilot holes and fasten

bracket securely to a structural support with the
hardware provided.

HARDWARE SHOWN ACTUAL SIZE

Lag Screw

5/16"-9x1-5/8"

Wall Mount

Optional

Mounting Holes

— Header Wall —

Horizontal Line

Highest Point of

Garage Door Travel

Vertical Centerline

of Garage Door

Vertical
Centerline of
Garage Door

Door

Spring

2x4

Structural

Support

Lag Screws

5/16"-9x1-5/8"

— Garage Door —

— Finished Ceiling —

Vertical Centerline

of Garage Door

Ceiling Mounting Holes

Header

Bracket

Door

Spring

6" (15 cm)
Maximum

Garage Door

Vertical
Centerline
of Garage Door

Lag Screws

5/16"-9x1-5/8"

— Header Wall —

Header
Bracket

Advertising