Cleveland Range 24/36CGM User Manual

Page 14

Advertising
background image

Operator’s Manual

P/N-260AOZ-A

______________________________________________________________________________

14

NOTE:

Only service technicians authorized by

Cleveland Range should perform the

descaling procedure. Read and

be familiar with the

procedure before starting.

Follow the procedure

exactly as given.

DISSOLVE Descaling Liquid
Use only Cleveland Range DISSOLVE
descaling product. Five gallons of descaling
liquid will be needed during this procedure.
Avoid unnecessary contact with the
descaling product; read and follow safety
precautions on the container label.

DISSOLVE Order Quantities

Container Size

Qty

Part No.

1-gallon bottles

6

106174

5-gallon pail

1

1061741

5-gallon pails

12

10617411

5-gallon pails

24

10617412

Overview of

Pump Descaling Procedures

Below is a summary of the descaling procedure
using the Pump System. The detailed procedure is
given on page 3 and 4.

Descaling should be done as required by your
maintenance schedule. The process takes about an
hour and a half to complete.

Part A – Equipment Setup

• Turn off the steamer to drain the boiler

• Remove the handhold plate of the boiler

and attach the hand-hole plate with the
descaling ports

• Connect feed and drain hoses

• Fill reservoir pail with DISSOLVE descaling

liquid and insert pump.

Part B – Descaling

• Turn on power to steamer; boiler will begin

to fill

• Turn on pump

• Monitor liquid levels in boiler and pail-

regulate level using hand valves

• Let liquid circulate for one hour

• Turn OFF steamer, pump; boiler will drain

Part C – Clean Water Flush

• Turn On steamer; boiler will fill

• Empty the pail of spent solution, refill with

fresh water

• Route Drain hose to floor drain

• Turn pump ON and circulate for 5 minutes,

monitoring water levels

• Turn OFF pump; close all valves; turn OFF

steamer; boiler will drain

• Replace hand-hole plate, check gasket

Part D –Take Down and Return to Service

• Turn ON Steamer; boiler will fill

• Remove hoses and couplings;

Activate steam switch; unit ready to operate

Advertising