Control panel operating procedures – AERCO BMK 2.0 LN Nat. Gas User Manual

Page 28

Advertising
background image

CONTROL PANEL OPERATING PROCEDURES

3-8

(a) Blower relay energizes and turns on

blower.

(b) Air/Fuel Valve rotates to full-open purge

position and closes purge position
switch. The dial on the Air/Fuel Valve
(Figure 3-4) will read 100 to indicate that
it is full-open (100%).

(c) The FIRE RATE bargraph will show

100%.

Figure 3-4.

Air/Fuel Valve In Purge Position


4. Next, the blower proof switch (Figure 3-5)

closes. The display will show Purging and
indicate the elapsed time of the purge cycle
in seconds. The normal (default) time for the
purge cycle is 7 seconds.

Figure 3-5.

Blower Proof Switch

5. Upon completion of the purge cycle, the

Control Box initiates an ignition cycle and the
following events occur:

(a) The Air/Fuel Valve rotates to the low-fire

ignition position and closes the ignition
switch. The dial on the Air/Fuel Valve
(Figure 3-6) will read between 25 and 35
to indicate that the valve is in the low-
fire position.

(b) Simultaneously, the ignition transformer

and the staged ignition solenoid valve
will be activated. The ignition trans-
former provides ignition spark. The
activated (open) solenoid valve allows a
small volume of gas to flow directly to
the burner assembly (Appendix F).

(c) The gas Safety Shut-Off Valve (SSOV)

is energized (opened) allowing gas to
flow into the Air/Fuel Valve.

6. Up to 7 seconds will be allowed for ignition to

be detected. The igniter relay will be turned
off one second after flame is detected.

7. After 2 seconds of continuous flame, Flame

Proven

will be displayed and the flame

strength will be indicated. After 5 seconds,
the current date and time will be displayed in
place of the flame strength.

Advertising