Preparation of coil assemblies, 1b+ ii water wizard water heaters he-110 – AERCO Packaged WaterWizard Steam-to-Water Heater User Manual

Page 35

Advertising
background image

1B+ II Water Wizard Water Heaters

HE-110

Installation, Operation & Maintenance Manual

OMM-0063_0C

MC2: 07/26/13 Page 35 of 50

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

SPUD

THREADS

SEALING

SURFACE

STEAM RISER OR

CONDENSATE RETURN

SPUD

Figure 13: Preparation of Riser/Return Spuds




10.10. PREPARATION OF COIL ASSEMBLIES

The Coil Assemblies of the Heater must be cleaned, inspected and prepared for
reassembly as follows:

























Preparation of Coil Assemblies Instructions

1) Visually inspect all Tail Piece sealing surfaces for cleanliness and evidence of damage.

(Figure 14).

2) Pull the Union Nut forward against the seating surface of the Tail Piece and rotate the Union Nut

several turns to check for any obstructions around the perimeter of the seating surface. (Figure
14).

3) Contact your local AERCO Representative for replacement of the Coil if obstructions prohibit the

rotation of the Union Nut.

4) Using a brass wire brush, clean the internal threads of the Union Nut.

5) Using a citric orange cleaner, spray the area between the Union Nut and Tail Piece. While

pulling the Union Nut forward against the seating surface of the Tail Piece, rotate the Nut to
remove any residue that can cause unneeded friction between the two surfaces.

6) Form the Coil by creating a 1/8” minimum gap between the individual tubes and a 1/8” to 1/4”

gap between the four layers of tubes as shown in Figure 15. Maintain a flat surface on the top
and bottom tube surface of the Coil.

Advertising