MC2: 07/26/13 Page 43 of 50

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

12.6. Reassembly of Shell

Reassemble the Heater Shell assembly as follows:

12.7. Reinstalling Heater in Facility

Reassemble all components that were disconnected in paragraph 5.2. When re-installing the Thermal
Element into the Thermal Well Bushing in the Top Head, be careful not to damage the Element against
the internal Coils. Straighten the Element before inserting.

12.8. Startup Procedure

Follow the operating procedures in Chapter X, OPERATING USING PNEUMATIC CONTROLS. If you are
using electronic controls, refer to document AC-105, Electronic Controls System (ECS) Manual.

Reassembly of Shell Instructions

1) Install fittings into the inlet and outlet of the Bottom for the Risers that can supply a hydrostatic

pressure source.

2) One fitting should have a valve for the release of internal air pressure.

3) The other fitting should be attached to a source to apply the maximum allowable working

pressure, (MAWP) to the internal Coil and Riser Bundle.

4) Apply MAWP to the Coil Bundle.

5) Close off both inlet and outlet valves to retain the internal pressure for 20 minutes.

6) If leaks are detected, remove the internal pressure.

7) Remove the leaking Coil and inspect for causes for leak.

8) If the leak is due to debris, clean the Coil and reinstall.

9) If there are damages to any surfaces, contact your AERCO Representative for instruction for

returning the failed Coil.

Advertising