System purging – AXEON DT-Series User Manual

Page 23

Advertising
background image

23

DT – Series User’s Manual
MKTF-208

06/12

SYSTEM PURGING

Carefully inspect your system before initial start-up. Check that all plumbing and
electrical connections are not loose or have not come undone during shipment. A user’s
manual, test results, and filter housing wrench will accompany your DT-Series reverse
osmosis system.

NOTE: LEAVE THE POWER TO THE SYSTEM OFF FOR THIS PROCEDURE.

1. Redirect permeate water to the drain for this procedure.
2. Fully open the concentrate valve #10 (counter clockwise). (Figure 1B, Page 17)
3. Fully close the recycle valve # 9 (clockwise) (if applicable). (Figure 1B, Page 17)
4. Offset the position of the bypass white lever on the solenoid valve #1. (Figure 2,

Page 23)

5. Turn the feed water on and let the system purge until no visible bubbles appear from

concentrate flow meter #14. (Figure 1B, Page 17)

6. Fully open the throttle valve #12 (Counter Clockwise). (Figure 1B, Page 17)

Lever Inline

Lever Offset

Operating Position

Bypass Position

FIGURE 2

Advertising