Ogb 20.20 - sequence of operations – Cleveland Range Convotherm Combination Oven-Steamer Gas 20.20 User Manual

Page 50

Advertising
background image

CLEVELAND RANGE OGB 20.20

SEQUENCE OF OPERATIONS


When using these instructions refer to the OGB 6.20 wiring schematic.

1

When 120 VAC is applied to the combi, it is sent to the Power Control Switch (S1).

2

When the Power Control Switch (S1) is closed

a

The red light in the switch is energized.

b

120 VAC is sent through the line filter (Z1) then through the 20 amp fuse (F10.1)

to terminal L1 on the Motor Drive (U10.1)

c

120 VAC is sent through the line filter (Z2) then through the 20 amp fuse (F10.2)

to terminal L1 on the Motor Drive (U10.2)

d

120vac is sent through the 2 amp fuse (F1.1) to

• To terminals 1 and 2 of connector X1 on the Upper Hot Air Power Burner

Control (U20)

• To terminals 1 and 2 of connector X1 on the Steam Power Burner Control

(U21)

• To terminals 1 and 2 of connector X1 on the Lower Hot Air Power Burner

Control (U22)

• The 12 VDC Power Supply (G1)

12 VDC is sent to terminals 1 and 2 of connector X28 on the Gas Board

(A20)

12 VDC is sent to terminal 3 and 4 of connector X10 on the Control Board

(A10)

• To terminal 1 of connector X12 on the Control Board (A10)

e

With 12 VAC to the Control Board (A10) The Operation Board (A11) is

energized
• An alarm will sound for one second

• All the LED’s and the display will energize one at a time.

• “STARTING” will be displayed for 3 seconds

• “Please wait” will be displayed

• The international model number will be displayed

• The time and date will be displayed and this will continue until the on/off

switch is depressed.

3

When the ON/OFF is depressed with the combi in the steam mode

a

After a date change (the first time the combi is turned on) the display will ask

“Generator Flush?”. If no answer is given in 10 seconds or a yes is indicated the
flush will begin.
• 120 VAC is sent from terminal 1 of connector X13 on the Control Board

(A10) to the Generator Pump (M4).

• As the water level drops below the probes the fill solenoid (Y3) will energize.

This rocking of the water will help flush scale from the generator.