5.

Installing Support Rail(s): See Figure 5. Place support rail(s)

in location using supplied 3/8” bolt, washer, serrated strut nut

and finger tighten (see Detail C). Align support rails with “A”

dimension from rack assembly drawing (See Detail D) and

install rail covers. Note: An internal/external “star” washer is

used in place of the lock washer on the bottom tier or step for

grounding connection. Optional third rail should be installed at

this time.

For rack lengths greater than 20 ft, the rails come in two

sections and are to be joined with a rail splice kit (P/N

RE05149 (See Figure 6). The rail lengths have been sized

to ensure that the joint occurs near the middle of the span

between two frames.

ASSEMBLY INSTRUCTIONS FOR RDC STANDARD AND EP RACKS

6.

Leveling: Check that the rack is level and square. Torque down

all bolts. First torque the cross brace bolts to 55-65 ft.-lb. [75-88

N-m], then torque the rail to frame bolts to 15-20 ft.-lbs [20-27

N-m]. Torque anchor bolts to manufacturer’s recommended

value.

This concludes the steps required to install a C&D Standard

Rack, please proceed to step 8 for cell installation or if you are

installing an EP Rack, continue on to step 7.

Rack Label Placement

"A"

"A"

See rack

assembly drawing

for "A" values

Support Rail Location

Support Rail

and Cover

3/8-16 Hex Bolt

Channel

Serrated Nut

Support Rail

and Cover

Rail Splice Kit

Assembled

(P/N RE05149)

Rail Splice Kit

FIGURE 5

DETAIL C

DETAIL D

FIGURE 6

Rail covers are supplied in 3’ and 4’ lengths. Rail covers are to be placed end to end over the entire rail length.