Platform Installation: The platform, ladder, handrail, and bracing are to be installed as
shown on the special platform detail provided. Use the part ID’s to locate the parts in the
proper location.

Explosion Vents (where applicable):

1. Figure 6 – The explosion vents are attached with a minimum of standard

steel fasteners for shipment. THESE MUST BE REMOVED and the
PVC Bolts installed that are included in the shipment. Extreme care should
be exercised when installing the PVC Bolts as they are very fragile. A
gasket is factory installed that will provide a seal between the vent panel
and the frame. DO NOT use silicone sealer or any other sealer or adhesive
at this joint as this will prevent the vent from operating properly.

2. The area around the vents should be clear of any personnel or obstructions

to prevent injury or damage.

Electrical: A 120 volt 60 Hertz circuit is required to operate the dust collector’s ½ HP
swep arm drive motor. A 230/460V 3 phase circuit is required to run the reverse air fan.

Gauges: Check the pressure differential gauge to make sure that the high-pressure tap is
connected below the tube sheet and the low-pressure tap is connected above the tube
sheet. Verify that the gauge have been zeroed prior to connection when it is in its
permanent mounting position.

Auxiliary Equipment: All auxiliary equipment must be installed according to its
manufacturer’s specifications and interlocked with the entire system as needed. Direction
of rotation of each item must be checked prior to start-up of the entire system.

4-2