Pre-installation checklist, Installation instructions – GE PGP959SETSS User Manual

Page 3

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation Instructions

PRE-INSTALLATION CHECKLIST

When preparing cooktop opening, make
sure the inside of the cabinet and the
cooktop do not interfere with each other.
(See section on preparing the opening.)

E Remove packaging materials, grate boxes,

regulator with literature, and literature
package from the cooktop before beginning
installation.

JI

m

--------------Literature Package

Grate boxes

Foam
Packaging

0

q

a

Q

Cooktop

E

Remove Installation Instructions from
literature pack and read them carefully
before you begin.

Be sure to place all literature (Owner's Manual,
Installation Instructions, etc.) in a safe place

for future reference.

E

E

E

Moke sure you hove oil the tools and
materials you need before storting the
installation of the cooktop.

Your home must provide the adequate
electrical service needed to safely and

properly use your cooktop. (Refer to section
on electrical requirements.)

When installing your cooktop in your home,

make sure all local codes and ordinances
are followed exactly as stated.

Make sure the wall coverings, countertop

and cabinets around the cooktop can
withstand heat (up to 200°F) generated by
the cooktop.

Advertising
This manual is related to the following products: