GE Feb-50 User Manual

Page 6

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

2

.

Plan Your Installation

After identifying the system wiring, use the WORK SHEET to the right to

plan you installation.

^

Up to 16 GE 2-9450 telephones may be connected to form your office

configuration. Each phone will be assigned a Station Number (first

colurnn). In the second column, write the location. Next, check either

desk or wall placement. Then check which lines are to be

connected to that station.

Important: Each telephone must be connected to line 1 and line 2 for
proper operation. The remaining lines 3 and 4 may — or may not —
be connected to each station as you desire. Finally, enter the user’s

name for each station.

Example:

Advertising