Installer’s Guide

BRASS LIQUID LINE SERVICE VALVE

The Brass Liquid Line Service Valve is factory shipped in the
seated position to hold factory charge. The pressure tap service
port (when depressed) opens only to the field brazing side of
the valve when the valve is in the seated position. The liquid
line valve is not a back seating valve (see WARNING below).

A

WARNING

Extreme caution should be exercised when opening the
Liquid Line Service Valve. Turn valve stem counterclock­

wise only until the stem contacts the rolled edge. (See

Figure 3) No torque is required.

BRASS GAS LINE SERVICE VALVE

The Brass Gas Line Service Valve is shipped in the closed
position to hold the factory refrigerant charge. The pressure
tap service port (when depressed) opens only to the field
brazing side when the valve is in the closed position.

The Gas Line Service Valve is full open with a 1/4 turn. See
Figure 4,

BRAZING REFRIGERANT LINES

1, Remove lower access cover to access service valves,

2, Before brazing, remove plugs from external copper stub

tubes. Clean internal and external surfaces of stub tubes
prior to brazing,

3, Cut and fit tubing, minimizing the use of sharp 90°

bends,

4, Insulate the entire gas line and its fittings,

5, Do NOT allow uninsulated liquid line to come in direct

contact with bare gas line,

6

,

Precautions should be taken to avoid heat damage

to the pressure tap valve core during brazing. It is
recommended that the pressure tap port valve
core be removed and a wet rag wrapped around
the valve body.

NOTICE:

Use care

to

make

sure that no moisture enters pressure tap

port,

while

wet rag is being used.

NOTICE:
Precautions should be taken to avoid heat damage to

basepan during brazing. It is recommended to keep the
flame directly off of the basepan.

7, Use a Dry Nitrogen Purge and Brazing Alloy without

flux when brazing the field line to the copper factory
connection. Flow dry nitrogen into either valve pressure
tap port, thru the tubing and out the other port while
brazing,

8, Braze using accepted good brazing techniques,

LEAK CHECK

IMPORTANT:

Replace pressure tap port valve core before attaching hoses for
evacuation.

After the brazing operation of refrigerant lines to both the
outdoor and indoor unit is completed, the field brazed
connections must be checked for leaks. Pressurize through
the service valve ports, the indoor unit and field refrigerant
lines with dry nitrogen to 350-400 psi. Use soap bubbles or
other leak-checking methods to see that all field joints are
leak-free! If not, release pressure; then repair!

SYSTEM EVACUATION

NOTE:
Since the outdoor unit has a refrigerant charge, the gas and

liquid line valves must remain closed.

1, Upon completion of leak check, evacuate the refrigerant

lines and indoor coil before opening the gas and liquid
line valves,

2, Attach appropriate hoses from manifold gauge to gas

and liquid line pressure taps,

NOTE:

Unnecessary switching of hoses can be avoided and com­

plete evacuation of all lines leading to sealed system can

be accomplished with manifold center hose and connect­
ing branch hose to a cylinder of R-410A and vacuum pump.

3, Attach center hose of manifold gauges to vacuum pump,

4, Evacuate until the micron gauge reads no higher than

350 microns,

5, Close off valve to vacuum pump and observe the micron

gauge. If gauge pressure rises above 500 microns in
one (1) minute, then evacuation is incomplete or system
has a leak,

6, If vacuum gauge does not rise above 500 microns in

one (1) minute, the evacuation should be complete,

7, With vacuum pump and micron gauge blanked off, open

valve on R-410A cylinder and charge refrigerant lines and
indoor coil with vapor to tank pressure of R-410A supply,

NOTE:
DO NOT VENT REFRIGERANT INTO THE ATMOSPHERE.

8, Close valve on R-410A supply cylinder. Close valves on

manifold gauge set and remove refrigerant charging
hoses from liquid and gas pressure tap ports,

NOTE:

A 3/16" Allen wrench is required to open liquid line service

valve. A 1/4" Open End or Adjustable wrench is required to

open gas line valve. A 3/4" Open End wrench is required to
take off the valve stem cap.

9, The liquid line shut-off valve can now be opened. Remove

shut-off valve cap. Fully insert hex wrench into the stem
and backout counterclockwise until valve stem just
touches rolled edge (approximately five [5] turns)
observing WARNING statement on page 2, See Figure 3,