Eagle Microsystems C7200P User Manual

Page 7

Advertising
background image

7

TC-SC

4.

Set top frame aside.

5.

Remove the 4 screws from Summing Box lid. Disconnect the wires of defective load cell

being replaced. Gently pull cable out of the bottom frame.

6.

Use hex wrenches to remove 2 socket head cap screws which secure load cell to frame.

7.

Save the overload rod.

8.

Install new load cell using 35 ft. lbs. torque to screws and fish wires back to the Summing Box.

9.

Insert leads into terminal as before and tighten. Put lid on Summing Box and tighten.

10. Install overload rod with 1/8" gap to frame. Add shock pad.

11. Put top frame back onto load cells. Add flat washer, lock washer and hex nut.

12. With a screw driver, adjust overload rod to 0.018" gap with feeler gage. Tighten hex nut

SECTION 6.0 SPECIFICATIONS

PHYSICAL SIZE:

Model C3600P: 24" X 60" X 10"
Model C7200P: 60" X 60" X 10"

WEIGHT:

Model C3600P: 235#
Model C7200P: 340#

CONSTRUCTION:

Welded steel box tubing frame.

FINISH:

All parts are stainless steel, plastic, or painted with acrylic
urathane paint.

CAPACITY:

Model C3600P: 4,000#
Model C7200P: 8,000#

SAFE OVERLOAD:

200% of Rated Capacity.

ULTIMATE OVERLOAD:

400% of Rated Capacity.

NOMINAL OUTPUT:

Model C3600P: 1.0 mV/V at 4,000#
Model C7200P: 1.2 mV/V at 8,000#

Advertising
This manual is related to the following products: