10 signals and indications, 1 signals – EVCO EVXS815P9 Installer manual User Manual

Page 41

Advertising
background image

EVCO S.p.A.

EVSX815 | Installer manual ver. 1.3 | Code 144XS815E134

page 41 of 60

10

SIGNALS AND INDICATIONS

10.1

Signals

The following table illustrates the meaning of the signalling LEDS.

LED

Meaning

Blast chilling LED.

If it is on:

-

blast chilling in progress.

If flashing:

-

a blast chilling and storage cycle will have been selected.

Deep freezing LED.

If it is on:

-

soft deep freezing will be in progress.

If flashing:

-

a soft deep freezing and storage cycle will have been selected.

HARD

hard blast chilling/deep freezing LED

If it is on:

-

hard blast chilling or deep freezing will be in progress.

If flashing:

-

a hard blast chilling and storage cycle or a deep freezing and storage cycle will have been

selected.

temperature-controlled blast chilling/temperature-controlled deep freezing LED.

If it is on:

-

a temperature-controlled blast chilling and storage cycle or a temperature-controlled deep

freezing and storage cycle will have been selected.

-

temperature-controlled blast chilling or deep freezing will be in progress.

If flashing:

-

the verification test for the correct insertion of the needle probe will not have been completed

successfully

-

needle probe heating will be in progress.

time-controlled blast chilling/time-controlled deep freezing LED.

If it is on:

-

a time-controlled blast chilling and storage cycle or a time-controlled deep freezing and storage

cycle will have been selected.

-

time-controlled blast chilling or deep freezing will be in progress.

If flashing:

-

setting the real date and time will be in progress.

Storage LED.

If it is on:

-

storage will be in progress.

Advertising