- 13 -

Figure 10 Probe Connector Assembly

E.

Cable Connection from Probe to Distribution Box
The RheoVac probes require special connectors to be installed on the supplied DeviceNet
type 5711 cable sections that go from the Distribution Box(es) to the probes. The probes
have the male mating connectors already installed. These connectors will use either the
“backshell nut” or “conduit connector” (see Figure 10) depending on whether the cable is
installed in a liquid-tight conduit. When installing without conduit, use the backshell nut;
when using liquid-tight conduit, use the conduit connector with o-ring.

1. Slide all of the appropriate parts onto the cable as shown.
2. Strip the cable conductors as shown. The connector (Turck p/n B4151-0/9) has 5 retention

screws to hold the wires in place. The use of crimp pins on the wires will greatly increase
connection reliability.

3. Loosen all 5 retention screws (do not completely remove).
4. Insert the wires, in accordance with color-coding shown (see Figure 6, insert).
5. Tighten the retention screws on each wire.
6. Reassemble the connector parts (Figure 10).