Interlogix MCR200-1T-1TW User Manual

Page 18

Advertising
background image

IFS MCR200-1T-1TW User Guide 15

Chassis Installation and Rack Mounting
(MCR200-1T-1TW

)

To install the Ethernet over VDSL2 Converter in a MCR300 19-inch
Converter Chassis with standard rack, follow the instructions described
below.

Step 1
: Place your MCR200-1T-1TW on a hard flat surface, with the front
panel positioned towards your front side.

Step 2
: Carefully slide in the module until it is fully and firmly fitted into the
slot of the converter chassis.

Figure 3-8: Insert a VDSL2 converter into an available slot


Step 3
: Attach a rack-mount bracket to each side of the Converter Chassis
with supplied screws attached to the package.

Step 4
: After the brackets are attached to the Converter Chassis, use
suitable screws to securely attach the brackets to the rack.

Step 5
: Proceed with the steps 4 and steps 5 of session Stand-alone
Installation
to connect the network cabling and supply power to your
Converter Chassis

You must use the screws supplied with the
mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate your
warranty.

Advertising