TESTING

YES/NO

DATE TO BE

COMPLETED

1. The cooling tower fan has been checked for blade pitch and

proper operation.

2. The chilled water and condenser water lines have been:

a. Filled

b. Tested

c. Flushed

d. Vented

e. Strainers cleaned

3. The chilled water and condenser water pumps have been

checked for proper rotation and flow.

4. The following cooling load will be available for start-up:

a. 25%

b. 50%

c. 75%

d. 100%

5. The refrigerant charge is at the machine.

6. Services such as electrical power and control air will be avail-

able at start-up.

7. The electrical and mechanical representatives will be available

to assist in commissioning the machine.

8. The customer’s operators will be available to receive instruc-

tions for proper operation of the chiller after start-up.

Concerns about the installation/request for additional assistance:

I am aware that the start-up time for a Carrier chiller can take between 2 and 6 days depending on the model of the machine and
the options and accessories used with it.

Your contact at the jobsite will be

Phone number

Beeper number

Fax number

In accordance with our contract, we hereby request the services of your technician to render start-up services per contract terms
for this job on

(Date). I understand that the technician’s time will be charged as extra services due to correcting items

in this checklist that are incomplete.

Signature of Purchaser

Signature of Jobsite Supervisor

----------------------------------------------------------------------------------------

CUT

ALONG

DOTTED

LINE

CUT

ALONG

DOTTED

LINE

Copyright 1997 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 2
Tab

5a

PC 211

Catalog No. 531-940

Printed in U.S.A.

Form 19XR-2SI

Pg CL-2

10-97

Replaces: 19XR-1SI

Advertising