Bulkhead bracket installation, Mounting procedure – Kannad Marine AIS SART User Manual

Page 13

Advertising
background image

Page 12

Bulkhead bracket installation

The AIS SART portable stowage case should be located where it will not hinder day-to-day
operations. Choose a protected location away from the extreme effects of the weather and
protected from powerful vessel wash down hoses. Where possible, position the AIS SART
adjacent to the ship

’s bridge wing exits ready for easy access in an emergency.


The AIS-SART portable stowage case fits over the permanently installed bulkhead bracket.
Allow a minimum of 250mm clear space above the highest point of the mounting bracket to
allow the bag to be stowed and removed from the bracket.













Mounting procedure

The bulkhead bracket is designed to mount on a flat surface using three fixing points. Fix the
mounting bracket in place using the three stainless steel screws (25mm in length) provided.
Or use stainless steel bolts with locking nuts or shake proof washers.

Check that the rear side of the mounting surface is clear and that the fixing screws will not
penetrate equipment fitted on this surface. Offer the bracket into the chosen position and
mark through the mounting slots using the bracket as a template.

Drop the AIS SART stowage case over the bracket. Push the bag firmly into place.

Stowage options
The stowage case provides additional protection for the AIS SART if you intend to keep it in a
carry off

‘safety ditch bag‘ or when transporting it from place to place.

250mm access
space above

Advertising