Deployment procedure – Kannad Marine AIS SART User Manual

Page 6

Advertising
background image

Page 5

Deployment procedure

1. Lift stowage case off the wall mounting bracket.
2. Carry to liferaft using the strap provided.
3. Open case and remove the AIS SART.
4. Fold the pole down and insert the AIS SART into the top of the pole.
5. Remove the rubber end cover from the pole and release pole sections.
6. Twist the sections to lock them in fully extended position.




































2

1

4

3

Advertising